Career UP NumericalReasoningTest17
timer --:--:--
单选题 问题图片

14. Architectural Bronze is an alloy, typically composed of 57% copper, 3% lead and 40% zinc. The current price of copper is £3,670 per metric ton and the current price of zinc is £1,240 per metric ton. If a foundry has 1275 tons of lead, how much would it cost to purchase enough copper and zinc to produce the maximum amount of architectural bronze possible with the existing amount of lead?