Career UP NumericalReasoningTest2
timer --:--:--
单选题 问题图片

9. R&D overheads were 12% of R&D spend in 2009. If R&D overheads are projected to rise by 1.1% between 2009 and 2010, what is the 2010 predicted R&D sum left after these overheads are taken into account?